Short answerTwo rounds is the right default for social media content: one round of changes and one check that the changes were made. Offer three for a new client in their first month while you learn their taste. The number matters far less than the definitions around it, so write down what counts as a round, what happens when the limit is reached, and what happens when the client does not reply at all.
Unlimited revisions sounds generous and is how retainers quietly become unprofitable. Not because clients are unreasonable, but because without a stated limit there is no natural moment to stop, so the conversation continues until somebody gets tired.
Here is the number, and more importantly the definitions that make the number mean anything.
Two rounds, as a default
For ordinary social media content, two rounds is right.
- Round one: the client reviews, approves most of it, and requests changes on some.
- Round two: you resubmit the changed posts, and they confirm the changes were made.
Round two is a verification, not a fresh opinion. That distinction is the thing you are actually buying with a limit, because the way a two-round job becomes a five-round job is that round two gets treated as another chance to reconsider.
Social content is high-volume and low-stakes per item. A single post is not a brand identity, and a post that is 90 per cent right and published on time beats one that is 100 per cent right and three weeks late. The revision policy should reflect that.
When to offer three
Three rounds is justified in a few specific cases, not as a general posture.
- A new client's first month. You do not know their taste yet and some of the back and forth is genuinely your learning curve. Say so, and say it is for the first month.
- A launch or campaign asset that carries real commercial weight, as opposed to a Tuesday filler post.
- Anything with a legal or compliance review at the client's end, where a round is consumed by someone who is not your contact.
Beyond three, the problem is never the revision count. It is the brief, the approver, or the fact that nobody signed off the plan before production started. See getting the calendar approved first.
Define what counts as a round
This is where most agreements fall apart. The client thinks a round is "a batch of changes", you think it is "a submission", and three emails of individual notes arrive across four days.
Write it down. The version that works:
A revision round is one consolidated set of change requests, submitted together. Change requests received after a round has been actioned count as a new round.
That single definition does more for your margin than adding or removing a round, because it stops the drip. It also nudges the client into reviewing the whole batch in one sitting, which is faster for them too.
Separate changes from new requests
The other definition you need, because these are routinely conflated:
A client asking for the right-hand column is not being difficult, they are commissioning something. Price it as such, kindly and immediately, and most of them will simply agree or withdraw the request.
What happens when the limit is reached
A limit with no stated consequence is not a limit. Pick one of three and put it in writing.
- Billed hourly past the limit, at a named rate. Cleanest, and it lets a client who genuinely wants more polish buy it.
- The post is parked and swapped for the next item in the calendar. Good for high-volume retainers where no single post matters much.
- It rolls into next month's allocation. Softest option, and it works if your retainer counts posts rather than hours.
Flag it on the round before you hit the limit, not on the round after. Template 8 in the approval email templates is written for exactly that message: it grants the extra round for free and still creates the record.
The clause most contracts are missing: default approval
Revision limits protect you from too much feedback. They do nothing about the far more common problem, which is no feedback at all.
So add a deemed-approval clause. This is the single most useful sentence you can add to a social media retainer:
Content submitted for approval will be treated as approved if no response is received within [three] business days, and may be scheduled and published as submitted.
Three business days is reasonable for a monthly batch. Two is fine for a single urgent post. Pair it with a reminder before the deadline so nobody is ambushed: you are trying to unblock the schedule, not to catch your client out.
Agree it at signing, repeat it in every approval email, and send the notice before you act on it. Used that way, most clients are relieved, because it removes the guilt of being the bottleneck. For why they stall in the first place, see why clients go quiet on approvals.
Measure it before you change it
Most people guess at their revision load, and the guess is usually driven by one memorable client. Count it for a month instead: posts submitted, posts approved first time, average rounds per post, and average days to approval, broken down by client.
Two patterns show up almost every time, and they need opposite responses:
- One client well above the average. This is a brief or an approver problem, not a policy problem. A conversation fixes it, a contract clause will not.
- Everyone slightly above. This is your intake. Something about the way you take the brief or present the plan is leaving room for interpretation.
If your approvals run through a system that records who approved what and when, this is an export rather than a research project. OK Social keeps the full history per post and exports it to a spreadsheet, which also makes it the easiest number to put in front of a client at renewal.
The short version
- Two rounds by default. Three for a new client's first month, or a launch asset.
- Define a round as one consolidated set of requests, submitted together.
- Write down the line between a revision and new work.
- State what happens past the limit: billed, parked, or rolled over.
- Add a deemed-approval clause. Silence is the bigger cost, not feedback.
- Count your actual rounds per client before changing any policy.
None of this is about being firm with clients. Clear definitions make you easier to work with, because your client stops guessing what is allowed. The cheapest round is still the one you avoid entirely by asking for feedback in a way that produces specifics.
Stop chasing approvals over email
OK Social sends your client one magic link, no login. They approve one post at a time, and you see it the second they do. Thirty days free, no card.
Start free trial